Meadow Solar Farm

StatusPlanning submitted

LocationHampshire

Site Overview

Meadow Solar Farm will have a capacity to produce up to 49.9MW of clean renewable energy and is located south east of Perham Down.  The development is proposed for a period of 40 years and is approximately 174 acres in size.

To find out more, visit the Meadow Solar Farm consultation website here.

< Back to development site list

Annual production (MWh)
~48,084

Installed capacity (MW)
~49.9

Households powered per annum
~16,581

CO2 emissions saved (tonnes per annum)
~10,210