Links Solar Farm

StatusPlanning received

LocationEssex

Site Overview

Located between the villages of Bradwell, Cressing and Silver End in Brantree, Essex, Links Solar Farm will produce approximately 35MW of clean renewable energy. This energy will be exported into the local network.  The development is proposed for a period of 40 years.

To find out more, visit the Links Solar Farm consultation website here.

< Back to development site list

Annual production (MWh)
~33,726

Installed capacity (MW)
~35

Households powered per annum
~11,630

CO2 emissions saved (tonnes per annum)
~7,161