Solar Park Installation at Callington

Callington

Site name

Callington

Site Commissioned

January 2014

Site overview

An east Cornwall site comprising ex-grazing land, part-circled by agricultural fields and designed to preserve important archaeological features. 43 acres of grassland are separated by tall hedgerows and trees, the vegetation amply screening and protecting abundant local bats, birds, invertebrates and small mammals.

Download the site PDF

Annual production (MWh)

6178

Installed capacity (MW)

6.4

Households powered per annum

1,993

CO2 emissions saved (tonnes per annum)

2,855